Mca millenium challenge ll – cim benin substation
The project cost hovers around 1.2 million Euros. SIEMENS ENERGY subcontractors SIEMENS GIS transformers were used in the construction of the substation.
The substation of the project features transformer infrastructure, a GIS room, a technical basement, an MV room and a control room. The total built-up area is 1,500m2. MEP Scope of work includes a fire detection system, a fire alarm, an overhead crane, ATEX equipment, CCTV lightning, electrical, A/C, earthing and a general electric substation.